There is now a ceiling, with HVAC, and lights...and (gasp) tile is being laid, we even have tile guys working on Saturday. Oh, and the plumber are the most incredible plumbers in the world (MIPITW), There will be no PVC in our plumbing. only copper and cast iron.
All of this progress was not crushed by the fact that we had an entire pallet of Z& logo bottled water stole from our location. Weird. If you happen to see bottles of water labeled "Z&H2O" they are stolen merchandise. Our glass being half full (pun inevitable) we needed to tweek the label color for our next pallet of water anyway. Like I wrote, what a week. In a great way.